{"id":1852,"date":"2023-05-04T17:26:42","date_gmt":"2023-05-04T15:26:42","guid":{"rendered":"http:\/\/grossmann.shytsee-projects.de\/referenzen\/alten-und-pflegeheim-haus-wittelsbach\/"},"modified":"2026-02-04T08:45:48","modified_gmt":"2026-02-04T07:45:48","slug":"retirement-nursing-home-haus-wittelsbach","status":"publish","type":"referenzen-cpt","link":"https:\/\/www.grossmann-bau.de\/en\/references\/retirement-nursing-home-haus-wittelsbach\/","title":{"rendered":"Retirement and Nursing Home \u2013 Haus Wittelsbach"},"content":{"rendered":"<section class=\"l-section wpb_row height_auto width_full\"><div class=\"l-section-h i-cf\"><div class=\"g-cols vc_row via_grid cols_2 laptops-cols_inherit tablets-cols_1 mobiles-cols_1 valign_top type_default\" style=\"--columns-gap:10%;--laptops-columns-gap:8%;--tablets-columns-gap:5rem;--mobiles-columns-gap:5rem;\"><div class=\"wpb_column vc_column_container\"><div class=\"vc_column-inner\"><div class=\"wpb_text_column\"><div class=\"wpb_wrapper\"><h2>The <span class=\"gmb-ul-s2\">Project<\/span><\/h2>\n<\/div><\/div><div class=\"w-separator size_custom\" style=\"height:2rem\"><\/div><div class=\"wpb_text_column\"><div class=\"wpb_wrapper\"><p>Turnkey partial renovation and partial new construction of a home for the elderly and nursing care in three construction phases as a general contractor, including coordination of the HVAC and electrical planning.<\/p>\n<\/div><\/div><div class=\"w-separator size_custom\" style=\"height:3rem\"><\/div><h5 class=\"w-text us_custom_7f5cd28b has_text_color\"><span class=\"w-text-h\"><span class=\"w-text-value\">Construction highlights:<\/span><\/span><\/h5><div class=\"wpb_text_column\"><div class=\"wpb_wrapper\"><p>Partial demolition and new construction, as well as core renovation of a senior citizens&#8217; nursing home and assisted living facility in Bad Aibling in three construction phases.<\/p>\n<ul>\n<li><strong>Lot 1:<\/strong> Demolition and new construction of House C and core renovation of House B with ward-by-ward nursing stations and common areas<\/li>\n<li><strong>Lot 2:<\/strong> Core renovation of Houses M and A with addition of a stairwell: These building sections consist of 1-2 room apartments for &#8220;assisted living&#8221; and, in part, nursing rooms. The complete, new central entrance area for the nursing home with an event room and lounge area is also located in House M. <\/li>\n<li><strong>Lot 3:<\/strong> Renovation of the scullery in House M, adjacent to the central kitchen, which remained in operation. Special feature: The operation continued in the building sections that had not yet been renovated\/already completed during the entire construction project. <\/li>\n<\/ul>\n<\/div><\/div><\/div><\/div><div class=\"wpb_column vc_column_container\"><div class=\"vc_column-inner\"><div class=\"g-cols wpb_row us_custom_c70c97eb gmb-ref-infobox via_grid cols_1 laptops-cols_inherit tablets-cols_inherit mobiles-cols_1 valign_top type_default stacking_default\" style=\"--columns-gap:3rem;\"><div class=\"wpb_column vc_column_container\"><div class=\"vc_column-inner\"><div class=\"w-vwrapper align_none valign_top\" style=\"--vwrapper-gap:0.5rem\"><h5 class=\"w-text us_custom_7f5cd28b has_text_color\"><span class=\"w-text-h\"><span class=\"w-text-value\">Project management<\/span><\/span><\/h5><div class=\"wpb_text_column\"><div class=\"wpb_wrapper\"><p>Mr. Tobias Maier \/ Mr. Michael Probst<\/p>\n<\/div><\/div><\/div><div class=\"w-separator size_custom\" style=\"height:2rem\"><\/div><div class=\"w-vwrapper align_none valign_top\" style=\"--vwrapper-gap:0.5rem\"><h5 class=\"w-text us_custom_7f5cd28b has_text_color\"><span class=\"w-text-h\"><span class=\"w-text-value\">Client<\/span><\/span><\/h5><div class=\"wpb_text_column\"><div class=\"wpb_wrapper\"><p>AWW Verwaltungsgesellschaft<br \/>\nHaus Wittelsbach GmbH<\/p>\n<p>Rosenheimer Str. 49<br \/>\n83043 Bad Aibling<\/p>\n<\/div><\/div><\/div><div class=\"w-separator size_custom\" style=\"height:2rem\"><\/div><div class=\"w-vwrapper align_none valign_top\" style=\"--vwrapper-gap:0.5rem\"><h5 class=\"w-text us_custom_7f5cd28b has_text_color\"><span class=\"w-text-h\"><span class=\"w-text-value\">Term<\/span><\/span><\/h5><div class=\"wpb_text_column\"><div class=\"wpb_wrapper\"><p>2017 &#8211; 2023 (KGR 200-500)<\/p>\n<\/div><\/div><\/div><\/div><\/div><\/div><\/div><\/div><\/div><\/div><\/section>\n","protected":false},"featured_media":2332,"template":"","categories":[34],"tags":[],"class_list":["post-1852","referenzen-cpt","type-referenzen-cpt","status-publish","has-post-thumbnail","hentry","category-turnkey-construction"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.grossmann-bau.de\/en\/wp-json\/wp\/v2\/referenzen-cpt\/1852","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.grossmann-bau.de\/en\/wp-json\/wp\/v2\/referenzen-cpt"}],"about":[{"href":"https:\/\/www.grossmann-bau.de\/en\/wp-json\/wp\/v2\/types\/referenzen-cpt"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.grossmann-bau.de\/en\/wp-json\/wp\/v2\/media\/2332"}],"wp:attachment":[{"href":"https:\/\/www.grossmann-bau.de\/en\/wp-json\/wp\/v2\/media?parent=1852"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.grossmann-bau.de\/en\/wp-json\/wp\/v2\/categories?post=1852"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.grossmann-bau.de\/en\/wp-json\/wp\/v2\/tags?post=1852"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}