{"id":2682,"date":"2025-09-14T19:37:34","date_gmt":"2025-09-14T17:37:34","guid":{"rendered":"http:\/\/grossmann.shytsee-projects.de\/referenzen\/kirchheim-residential-complex\/"},"modified":"2026-02-04T08:42:39","modified_gmt":"2026-02-04T07:42:39","slug":"kirchheim-residential-complex","status":"publish","type":"referenzen-cpt","link":"https:\/\/www.grossmann-bau.de\/en\/references\/kirchheim-residential-complex\/","title":{"rendered":"Kirchheim Residential Complex"},"content":{"rendered":"<section class=\"l-section wpb_row height_auto width_full\"><div class=\"l-section-h i-cf\"><div class=\"g-cols vc_row via_grid cols_2 laptops-cols_inherit tablets-cols_1 mobiles-cols_1 valign_top type_default\" style=\"--columns-gap:10%;--laptops-columns-gap:8%;--tablets-columns-gap:5rem;--mobiles-columns-gap:5rem;\"><div class=\"wpb_column vc_column_container\"><div class=\"vc_column-inner\"><div class=\"wpb_text_column\"><div class=\"wpb_wrapper\"><h2>The <span class=\"gmb-ul-s2\">Project<\/span><\/h2>\n<\/div><\/div><div class=\"w-separator size_custom\" style=\"height:2rem\"><\/div><div class=\"wpb_text_column\"><div class=\"wpb_wrapper\"><p>The residential complex is divided into 4 individual buildings with a three-story construction. All buildings have a basement, with an underground parking garage under House 1 and House 2. Upon completion, the residential complex will consist of 74 apartments and 2 units for commercial use. This results in a total living space of 3,410 m\u00b2 and a total commercial usable area of 152 m\u00b2.<\/p>\n<p>On the north side, there will also be a balcony access and a residential street to develop the apartments. The 1-3 room apartments are mostly equipped with prefabricated bathroom units. After completion of the structural work last year, the turnkey work began this year. House 1 has already been completed and occupied on November 1, 2024. For House 2 and 3, completion is planned for the end of this year. House 4, as well as the outdoor facilities and residential street, will be completed in spring 2025.<\/p>\n<\/div><\/div><div class=\"w-separator size_custom\" style=\"height:3rem\"><\/div><h5 class=\"w-text us_custom_7f5cd28b has_text_color\"><span class=\"w-text-h\"><span class=\"w-text-value\">Construction:<\/span><\/span><\/h5><div class=\"wpb_text_column\"><div class=\"wpb_wrapper\"><ul>\n<li>Skeleton construction with reinforced concrete<\/li>\n<li>Longitudinal walls in timber frame construction<\/li>\n<li>Foundation RC Floor slabs \/ RC Foundations<\/li>\n<li>Ceilings made of filigree slabs<\/li>\n<li>Installed concrete mass: 3,200 m\u00b3<\/li>\n<li>Installed reinforcing steel mass: 422 tons<\/li>\n<\/ul>\n<\/div><\/div><\/div><\/div><div class=\"wpb_column vc_column_container\"><div class=\"vc_column-inner\"><div class=\"g-cols wpb_row us_custom_c70c97eb gmb-ref-infobox via_grid cols_1 laptops-cols_inherit tablets-cols_inherit mobiles-cols_1 valign_top type_default stacking_default\" style=\"--columns-gap:3rem;\"><div class=\"wpb_column vc_column_container\"><div class=\"vc_column-inner\"><div class=\"w-vwrapper align_none valign_top\" style=\"--vwrapper-gap:0.5rem\"><h5 class=\"w-text us_custom_7f5cd28b has_text_color\"><span class=\"w-text-h\"><span class=\"w-text-value\">Project and construction management<\/span><\/span><\/h5><div class=\"wpb_text_column\"><div class=\"wpb_wrapper\"><p>Alexander Stier<\/p>\n<\/div><\/div><\/div><div class=\"w-separator size_custom\" style=\"height:2rem\"><\/div><div class=\"w-vwrapper align_none valign_top\" style=\"--vwrapper-gap:0.5rem\"><h5 class=\"w-text us_custom_7f5cd28b has_text_color\"><span class=\"w-text-h\"><span class=\"w-text-value\">Construction management<\/span><\/span><\/h5><div class=\"wpb_text_column\"><div class=\"wpb_wrapper\"><p>Stefan Fleschhut<\/p>\n<\/div><\/div><\/div><div class=\"w-separator size_custom\" style=\"height:2rem\"><\/div><div class=\"w-vwrapper align_none valign_top\" style=\"--vwrapper-gap:0.5rem\"><h5 class=\"w-text us_custom_7f5cd28b has_text_color\"><span class=\"w-text-h\"><span class=\"w-text-value\">Construction management working student<\/span><\/span><\/h5><div class=\"wpb_text_column\"><div class=\"wpb_wrapper\"><p>Michael L\u00f6w<\/p>\n<\/div><\/div><\/div><\/div><\/div><\/div><\/div><\/div><\/div><\/div><\/section>\n","protected":false},"featured_media":2681,"template":"","categories":[34],"tags":[],"class_list":["post-2682","referenzen-cpt","type-referenzen-cpt","status-publish","has-post-thumbnail","hentry","category-turnkey-construction"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.grossmann-bau.de\/en\/wp-json\/wp\/v2\/referenzen-cpt\/2682","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.grossmann-bau.de\/en\/wp-json\/wp\/v2\/referenzen-cpt"}],"about":[{"href":"https:\/\/www.grossmann-bau.de\/en\/wp-json\/wp\/v2\/types\/referenzen-cpt"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.grossmann-bau.de\/en\/wp-json\/wp\/v2\/media\/2681"}],"wp:attachment":[{"href":"https:\/\/www.grossmann-bau.de\/en\/wp-json\/wp\/v2\/media?parent=2682"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.grossmann-bau.de\/en\/wp-json\/wp\/v2\/categories?post=2682"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.grossmann-bau.de\/en\/wp-json\/wp\/v2\/tags?post=2682"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}