{"id":2689,"date":"2025-09-14T18:10:30","date_gmt":"2025-09-14T16:10:30","guid":{"rendered":"http:\/\/grossmann.shytsee-projects.de\/referenzen\/floetzinger-brewery-logistics-hall\/"},"modified":"2026-02-04T08:43:15","modified_gmt":"2026-02-04T07:43:15","slug":"floetzinger-brewery-logistics-hall","status":"publish","type":"referenzen-cpt","link":"https:\/\/www.grossmann-bau.de\/en\/references\/floetzinger-brewery-logistics-hall\/","title":{"rendered":"Fl\u00f6tzinger Brewery Logistics Hall"},"content":{"rendered":"<section class=\"l-section wpb_row height_auto width_full\"><div class=\"l-section-h i-cf\"><div class=\"g-cols vc_row via_grid cols_2 laptops-cols_inherit tablets-cols_1 mobiles-cols_1 valign_top type_default\" style=\"--columns-gap:10%;--laptops-columns-gap:8%;--tablets-columns-gap:5rem;--mobiles-columns-gap:5rem;\"><div class=\"wpb_column vc_column_container\"><div class=\"vc_column-inner\"><div class=\"wpb_text_column\"><div class=\"wpb_wrapper\"><h2>The <span class=\"gmb-ul-s2\">Project<\/span><\/h2>\n<\/div><\/div><div class=\"w-separator size_custom\" style=\"height:2rem\"><\/div><div class=\"wpb_text_column\"><div class=\"wpb_wrapper\"><p>Fl\u00f6tzinger Brewery Logistics Hall, Construction Phase 2<\/p>\n<p>September 2023 &#8211; October 2024<\/p>\n<p>Storage area 4,800m\u00b2<\/p>\n<p>Loading road 1,250m\u00b2<\/p>\n<p>Usable area of office wing, ground and upper floor 160m\u00b2<\/p>\n<\/div><\/div><div class=\"w-separator size_custom\" style=\"height:3rem\"><\/div><h5 class=\"w-text us_custom_7f5cd28b has_text_color\"><span class=\"w-text-h\"><span class=\"w-text-value\">Construction:<\/span><\/span><\/h5><div class=\"wpb_text_column\"><div class=\"wpb_wrapper\"><ul>\n<li>Main supporting structure consisting of 64 precast columns<\/li>\n<li>4,200m\u00b2 aerated concrete walls, of which 1,400m\u00b2 with fire wall quality F90, parapet height 10.95m<\/li>\n<li>6,200m\u00b2 non-reinforced rolled concrete slab with partial concrete core activation<\/li>\n<\/ul>\n<\/div><\/div><div class=\"w-separator size_custom\" style=\"height:3rem\"><\/div><h5 class=\"w-text us_custom_7f5cd28b has_text_color\"><span class=\"w-text-h\"><span class=\"w-text-value\">Special features<\/span><\/span><\/h5><div class=\"wpb_text_column\"><div class=\"wpb_wrapper\"><p>In a construction period of 12 months, the Fl\u00f6tzinger Brewery&#8217;s logistics hall was built in the Schechen industrial area next to the tank farm already presented in 2023 in turnkey construction, in which all four GROSSMANN departments were involved. Under the coordination of the turnkey construction department, the internal coordination of the structural engineering, glued laminated timber construction and asphalt construction trades as well as the technical trades electrical, HVAC (heating, ventilation, sanitary) and 20 other trades took place. <\/p>\n<p>The structural engineering department started the leveling work and precast columns in 2023. Due to weather-related restrictions over the turn of the year, the construction process had to be changed for early use. In just 9 weeks of construction, both the aerated concrete facade and the roof structure &#8211; in a complete concept from the glued laminated timber construction department with structural and joinery planning &#8211; including temporary sealing were completed by the end of March 2024, so that the gravel leveling and non-reinforced rolled concrete floor slab could be produced as the hall floor in April 2024.   <\/p>\n<p>As a result, the hall could be used to a limited extent by the Fl\u00f6tzinger Brewery in May, while the main work on the electrical and rainwater drainage systems as well as the interior finishing of the office wing with lounge area and staff toilets were carried out in parallel.<\/p>\n<p>Only after their completion, the main work on the roof took place over the summer, including roof greening, smoke and heat extraction system (SHEV) and rope safety devices. <\/p>\n<p>In the outdoor area, a total of 3,600m\u00b2 of asphalt driving surface was installed in the northern and western areas of the hall in May and June 2024, and a semi-rigid asphalt surface cemented in with cement was produced in the southern area on an area of 4,000m\u00b2, which offers very good resistance to high forklift loads and thus the development of ruts.<\/p>\n<p>When the hall was built, the expansion in the eastern area for a future filling system was already taken into account<\/p>\n<\/div><\/div><\/div><\/div><div class=\"wpb_column vc_column_container\"><div class=\"vc_column-inner\"><div class=\"g-cols wpb_row us_custom_c70c97eb gmb-ref-infobox via_grid cols_1 laptops-cols_inherit tablets-cols_inherit mobiles-cols_1 valign_top type_default stacking_default\" style=\"--columns-gap:3rem;\"><div class=\"wpb_column vc_column_container\"><div class=\"vc_column-inner\"><div class=\"w-vwrapper align_none valign_top\" style=\"--vwrapper-gap:0.5rem\"><h5 class=\"w-text us_custom_7f5cd28b has_text_color\"><span class=\"w-text-h\"><span class=\"w-text-value\">Structural engineering site management<\/span><\/span><\/h5><div class=\"wpb_text_column\"><div class=\"wpb_wrapper\"><p>Martin Haslberger<\/p>\n<\/div><\/div><\/div><div class=\"w-separator size_custom\" style=\"height:2rem\"><\/div><div class=\"w-vwrapper align_none valign_top\" style=\"--vwrapper-gap:0.5rem\"><h5 class=\"w-text us_custom_7f5cd28b has_text_color\"><span class=\"w-text-h\"><span class=\"w-text-value\">Structural engineering foremen<\/span><\/span><\/h5><div class=\"wpb_text_column\"><div class=\"wpb_wrapper\"><p>Peter Wallner, Gunter Maurer, Dragan Brukic<\/p>\n<\/div><\/div><\/div><div class=\"w-separator size_custom\" style=\"height:2rem\"><\/div><div class=\"w-vwrapper align_none valign_top\" style=\"--vwrapper-gap:0.5rem\"><h5 class=\"w-text us_custom_7f5cd28b has_text_color\"><span class=\"w-text-h\"><span class=\"w-text-value\">Glued laminated timber construction site management<\/span><\/span><\/h5><div class=\"wpb_text_column\"><div class=\"wpb_wrapper\"><p>Johannes Koller<\/p>\n<\/div><\/div><\/div><div class=\"w-separator size_custom\" style=\"height:2rem\"><\/div><div class=\"w-vwrapper align_none valign_top\" style=\"--vwrapper-gap:0.5rem\"><h5 class=\"w-text us_custom_7f5cd28b has_text_color\"><span class=\"w-text-h\"><span class=\"w-text-value\">Shop drawings glued laminated timber construction<\/span><\/span><\/h5><div class=\"wpb_text_column\"><div class=\"wpb_wrapper\"><p>Elisabeth Schm\u00f6ller<\/p>\n<\/div><\/div><\/div><div class=\"w-separator size_custom\" style=\"height:2rem\"><\/div><div class=\"w-vwrapper align_none valign_top\" style=\"--vwrapper-gap:0.5rem\"><h5 class=\"w-text us_custom_7f5cd28b has_text_color\"><span class=\"w-text-h\"><span class=\"w-text-value\">Asphalt construction site management<\/span><\/span><\/h5><div class=\"wpb_text_column\"><div class=\"wpb_wrapper\"><p>David Marton, Thomas Amann<\/p>\n<\/div><\/div><\/div><div class=\"w-separator size_custom\" style=\"height:2rem\"><\/div><div class=\"w-vwrapper align_none valign_top\" style=\"--vwrapper-gap:0.5rem\"><h5 class=\"w-text us_custom_7f5cd28b has_text_color\"><span class=\"w-text-h\"><span class=\"w-text-value\">Turnkey construction site management<\/span><\/span><\/h5><div class=\"wpb_text_column\"><div class=\"wpb_wrapper\"><p>Max G\u00fcdemann, Michael Probst<\/p>\n<\/div><\/div><\/div><div class=\"w-separator size_custom\" style=\"height:2rem\"><\/div><div class=\"w-vwrapper align_none valign_top\" style=\"--vwrapper-gap:0.5rem\"><h5 class=\"w-text us_custom_7f5cd28b has_text_color\"><span class=\"w-text-h\"><span class=\"w-text-value\">Finishing foreman<\/span><\/span><\/h5><div class=\"wpb_text_column\"><div class=\"wpb_wrapper\"><p>Horst Loser<\/p>\n<\/div><\/div><\/div><\/div><\/div><\/div><\/div><\/div><\/div><\/div><\/section>\n","protected":false},"featured_media":2684,"template":"","categories":[33,16],"tags":[],"class_list":["post-2689","referenzen-cpt","type-referenzen-cpt","status-publish","has-post-thumbnail","hentry","category-timber-construction","category-structural-engineering"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.grossmann-bau.de\/en\/wp-json\/wp\/v2\/referenzen-cpt\/2689","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.grossmann-bau.de\/en\/wp-json\/wp\/v2\/referenzen-cpt"}],"about":[{"href":"https:\/\/www.grossmann-bau.de\/en\/wp-json\/wp\/v2\/types\/referenzen-cpt"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.grossmann-bau.de\/en\/wp-json\/wp\/v2\/media\/2684"}],"wp:attachment":[{"href":"https:\/\/www.grossmann-bau.de\/en\/wp-json\/wp\/v2\/media?parent=2689"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.grossmann-bau.de\/en\/wp-json\/wp\/v2\/categories?post=2689"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.grossmann-bau.de\/en\/wp-json\/wp\/v2\/tags?post=2689"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}