The Project
- Complete upgrade of the St 2080 on the same route with ramps to the new west tangent
- New construction of a pedestrian and cycle path with earthworks and superstructure
- New roundabout construction in concrete
- Construction of the route of the west tangent over a length of 450 m
- Construction of bridge BW 9.2 in the course of the St 2080 over the west tangent
Key data:
- Earth movement: 90,000 m³
- Asphalt 3-layer: 20,000 m²
- Cycle-pedestrian path: 4,900 m²
- Concrete pavement: 2,900 m²
- Corrugated steel pipe culvert: 100 m
Bridge:
- Concrete: 1,640 m³
- Reinforcement: 135 tons
- Prestressing steel: 25 tons
Client
Staatliches Bauamt Rosenheim
Wittelsbacherstraße 11
83022 Rosenheim
Execution:
2017