Schwabach Triple Sports Hall

Timber Construction

The Project

A triple sports hall was built for the city of Schwabach. The construction uses V-supports and a continuous top chord. The 2 m cantilevered BS trussed rafters span 32.10 m and form the roof structure.

The hip design was implemented with prefabricated, skewed elements, while the roof level was braced and stiffened by insulated rib elements.

Client

City of Schwabach

Alfred-Achilles-Str. 6/8
91126 Schwabach

Execution:

2013

Architect / Engineering office:

Heydorn Eaton Architekten

Schlesische Straße 29/30 i3
10997 Berlin

Referenz Dreifachsporthalle Schwabach
Referenz Dreifachsporthalle Schwabach
Referenz Dreifachsporthalle Schwabach
Referenz Dreifachsporthalle Schwabach

Further Insights into our Department

Discover the variety of our construction projects and see our experience for yourself.

Flötzinger Brewery Logistics Hall
Aschheim School Campus
Production building Schaltbau Next Factory
New construction of a stud farm in the Rosenheim district
Deutscher Alpenverein
Integrated comprehensive school Rinteln