The Project
Extension of production building for pharmaceutical products in in-situ concrete construction, consisting of:
- two basement floors / ground floor + upper floors 1 to 3
- complete basement including load-bearing floor slab in waterproof concrete
Execution of the structural work including excavation shoring and underpinning of the existing building with HDI
Architect / Engineering office
busl.ppm
Prinzregentenstraße 130
81677 Munich
Client
Fuhrer Real Estate Holding GmbH
Am Haag 6
82166 Gräfelfing
Execution
2018 – 2020